Dosch, Fr. Jordan Director of Vocations | Diocese of Bismarck
Dosch, Fr. Jordan Director of Vocations | Diocese of Bismarck
Starting May 13, 2025, the city of Bismarck will begin sealing cracks on several arterial streets. The project is expected to last approximately five weeks, depending on weather conditions. Although roads will remain open, drivers should anticipate lane shifts, reduced widths, or the presence of flaggers.
The list of streets includes:
- 12th St from University Dr to Burleigh Ave
- Yegen Rd from Morrison Ave to Hagen Ave
- Main Ave from Bismarck Expwy to 66th St SE
- 57th Ave N from Washington St to State St
- 43rd Ave N from Roosevelt Dr to Silbernagel Dr
On these routes marked with an asterisk (*), work will not occur between 7:30 am and 8:00 am or between 4:30 pm and 5:30 pm. Additional streets include Washington St (Calgary Ave to Century Ave and Easy St to near Billings Dr) and Airport Rd (Main Ave to University Dr).
For real-time updates on road construction in Bismarck, visit the city's online map viewer.